C13, C15, C18 SA enclosure. 350-600 kW 60 Hz
These sound attenuated, factory installed enclosures incorporate internally mounted super critical level silencers, designed for safety and aesthetic value on integral fuel tank base or optional dual wall integral fuel tank base for total fluid containment. These enclosures are of extremely rugged construction to withstand exposure to the elements and provide weather protection.
Length
C13 - 5461 mm, C15 - 4948 mm, C18 - 5187 mm
Width
C13, C15 & C18 - 2014 mm
Height
C13 - 2743 mm, C15 - 2619 mm, C18 - 2561 mm
DOWNLOAD TECHNICAL SPECIFICATIONS
Specification
Value
Length
C13 - 5461 mm, C15 - 4948 mm, C18 - 5187 mm
Width
C13, C15 & C18 - 2014 mm
Height
C13 - 2743 mm, C15 - 2619 mm, C18 - 2561 mm
Weight
253 - 817 kg
  • Large cable entry area for installation ease
  • Accommodates side mounted single or multiple breaker
  • Three doors on both sides
  • Vertically hinged allow 180° opening rotation and retention with door stays
  • Lube oil and coolant drains piped to the exterior of the enclosure base
  • Radiator fill cover
  • Lockable access doors which give full access to control panel and breaker
  • Cooling fan and battery charging alternator fully guarded
  • Fuel fi ll, oil fi ll and battery can only be reached via lockable access
  • Externally mounted emergency stop button
  • Designed for spreader bar lifting to ensure safety
  • Stub-up area is rodent proof
These enclosures are of extremely rugged construction to withstand outdoor exposure and rough handling common on many construction sites.
  • Caterpillar yellow or white paint
  • UL Listed integral fuel tank with 670, 400, and 300 gallon capacities
  • UL Listed sub base fuel tank with 660, 1000, 1900, and 2200 gallon capacities
  • Seismic certifi cation per applicable building codes: IBC 2000, IBC 2003, IBC 2006, IBC 2009, IBC 2012, CBC 2007, CBC 2010
  • IBC Certifi cation for 150 mph wind loading
  • Anchoring details are site specifi c and are dependent on many factors such as generator set size, weight, and concrete strength. IBC Certifi cation requires that the anchoring system used is reviewed and approved by a professional engineer
  • AC/DC lighting package